Location

Great Eastern Street

This project comprises of the construction of a new 5 storey 125 bedroomed Hotel in the heart of Shoreditch.

The scheme required the demolition of existing derelict buildings on the site which were classified as dangerous structures, together with the removal of substantial quantities of asbestos materials.  In conjunction with the demolition works the existing building facades were retained by a temporary support system to enable them to form a focal point of the new development.

The project has 2 basement levels, the formation of which requires contiguous piled retaining walls to be constructed to the whole perimeter of the site prior to excavation to depths exceeding 8 metres.  Following the formation of the 2 new basement levels a 5 storey concrete frame will be erected with external cladding and general high quality fitting out works.

The project is scheduled for completion in October 2016.

 

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close