Trident Point, Harrow, successfully completed cladding rectification works in 2024. The team took pride in ensuring that all current building fire and acoustic regulations were met, with resident safety remaining a top priority throughout the project. This was a logistically challenging scheme, positioned on a major arterial route through Harrow, Middlesex, adjacent to the TfL network.
The project involved the removal of all non-compliant materials from the building’s elevations, including existing timber cladding, Aluminium Composite Material (ACM) trespass panels, balcony timber decking, and phenolic insulation behind brickwork and render.