The Westin London City

The Westin London City

Transformation of offices into a 10-storey, 222-room Westin Hotel with wellness centre, gym, luxury apartments, and a public riverside walkway in Central London.

The Imperial Hotel

The Imperial Hotel

Major refurbishment of The Imperial Hotel, Bloomsbury into a 4-star flagship, including sky bar, wellness area, façade upgrades, and full internal fit-out by 2026.

The TAJ, 51 Buckingham Gate

The TAJ, 51 Buckingham Gate

Refurbishment of luxury hotel apartments, featuring bespoke joinery, high-spec mechanical upgrades, and the world’s only Jaguar Suite.

The Dorchester

The Dorchester

12-week refurbishment of The Dorchester’s Grand Ballroom and lobby, delivering luxury finishes, lighting upgrades, and artisan detailing while aligning with the hotel’s prestigious event schedule.

Bridewell Place

Bridewell Place

Redevelopment of office space into a 156-room Moxy Hotel, including partial demolition, two-floor extension, recladding, green roof, and sustainable plant installation.

Crowne Plaza

Crowne Plaza

Completed in August 2025, this project included full hotel refurbishment and a seven-storey extension with 70 new bedrooms, reception, and corridor areas.

The Biltmore, Mayfair

The Biltmore, Mayfair

Complete refurbishment of the former Millennium Hotel into a 323-bed, five-star Biltmore Hotel, including penthouse suites and high-spec front and back of house areas.

Hart Shoreditch Hotel London

Hart Shoreditch Hotel London

Construction of a 125-bedroom luxury hotel preserving a Victorian façade, featuring deep basements, bespoke interiors, and high-end finishes.

The Trafalgar St. James

The Trafalgar St. James

Refurbishment of The Trafalgar St. James Hotel, including new entrance, reception revamp, Rockwell Bar upgrade, basement conversion, and accessibility improvements to meet Curio standards.

Lord’s Jim Hotel Kensington

Lord’s Jim Hotel Kensington

Redevelopment of two existing hotels into one 4-star, 102-bedroom hotel with new façade, lobby, rear extension, and full M&E integration, in active site conditions.